Quality Inspection Overview

Small diameter tube and pipe quality inspection poses a particular set of challenges. Our seasoned team of highly qualified inspectors have been exposed to many practices and procedures over the years.  This allows us to reliably supply the industry with sustainable quality inspection for each and every order.

Every part manufactured in our facility is treated the same under our quality system.

Quality Process steps that are applied to each customer part:

  • First-off verifications for all processes

  • Final dimensional Inspection

  • Low pressure leak testing

  • Dye penetration testing for welds as an alternative to air testing as required

Quality Inspection In-House:

Sample of fabricated pipe assembly parts ready for inspection set up in a fit-weld inspection jig.

Project Date:
Thursday, July 21, 2016
Market:
Material:

A prototype jig during the quality inspection process.

Project Date:
Wednesday, July 20, 2016
Market:
Material:

Kubes offers in house low pressure air leak testing as part of our quality inspection process.

Project Date:
Wednesday, July 20, 2016
Material:

All of our threaded pipe is checked during the quality inspection process with verified ring gauges that are calibrated regularly.

Project Date:
Wednesday, July 20, 2016
Material:

First off process quality inspection of a pipe assembly with an operator and inspector.

Project Date:
Tuesday, July 19, 2016
Market:
Material:

Our in-house rust inhibitor (dunk tank) promotes corrosion free service during shipping, storage & the complete life-cycle of the part.  

Project Date:
Tuesday, July 19, 2016
Material:

In-house quality inspection of an emergency valve.

Project Date:
Tuesday, July 19, 2016
Market:
Material:

The completed valve assembly waiting first off inspection.

Project Date:
Tuesday, July 19, 2016
Market: